ID1920x260-Information-for-Builders-Excavator-Close-up
IM768x260-Information-for-Builders-Excavator-Close-up

Information for Builders

Service Line Standards

The Service Line Standards cover the acceptable design and construction features for connection to College Utilities and Golden Heart Utilities water and wastewater systems. Deviation from this standard is permitted only by written consent of the Utility. If you have any questions please Contact Us.

Standards of Construction

The Standards of Construction document provides the technical aspects of installing water and wastewater facilities. It is designed to aid in meeting the requirements of the Utility for newly constructed systems that will be connected to our infrastructure.  Deviation from this standard is permitted only by written consent of the Utility. If you have any questions please Contact Us.

Water System Diagrams

Wastewater System Diagrams


NOTE: These document are updated periodically, usually on an annual basis early in the year before the construction season begins. Please check this site to be sure you are using the most recent version of the document or email us to be notified when when new standards are issued.